Front Barrel (Nov.2002-) |
Up |
Edge Cutting | Fiber Cutting |
PMT Assembling | Setup of Cosmic Ray Test |
Stacking | Storage Area |
Fiber Bond (Feb. 2003) | Fiber Cutting (Apr. 2003) |
Front Barrel Construction Stage (Jul. 2003) | Front Barrel Assembling (1) (Aug. 2003) |
Front Barrel Assembling (2) (Sep.04 2003) | Front Barrel Assembling (3) (Sep.05 2003) |