Front Barrel (Nov.2002-)

Up


Edge Cutting Fiber Cutting
PMT Assembling Setup of Cosmic Ray Test
Stacking Storage Area
Fiber Bond (Feb. 2003) Fiber Cutting (Apr. 2003)
Front Barrel Construction Stage (Jul. 2003) Front Barrel Assembling (1) (Aug. 2003)
Front Barrel Assembling (2) (Sep.04 2003) Front Barrel Assembling (3) (Sep.05 2003)
(Picture size: 300-400KB)

Photo album generated by album from MarginalHacks on Sun Dec 15 18:43:56 2002